Friday 1st December 2006 |
|
|
Penryn (Cornwall) |
Trees on the line |
5 hours 30 minutes |
South East England |
Slippery rails |
8 hours 30 minutes |
Ashburys (Manchester) |
Broken down train |
3 hours 30 minutes |
|
|
|
Thursday 30th November |
|
|
Bristol area |
Obstruction on the line |
2 hours 8 minutes |
London Victoria |
Broken down train |
2 hours |
Maidenhead |
Broken down train |
2 hours 53 minutes |
South London |
Slippery rails |
2 hours 47 minutes |
Teddington |
Over-running engineering work |
2 hours |
Malvern Link |
Bridge strike |
11 hours |
Chichester/Barnham area |
Fatality |
2 hours |
Wednesday 29th November |
|
|
Luton |
Signalling problems |
In excess of 8 hours |
Elsenham |
Overhead wire problems |
19 hours |
Tuesday 28th November |
|
|
Wakefield Kirkgate |
Signalling problems |
5 hours 30 minutes |
Glasgow – Wemyss Bay route |
Signalling problems |
2 hours 15 minutes |
Pewsey |
Derailed engineers train |
Approx 24 hours |
Bromsgrove |
Fatality |
2 hours 25 minutes |
Chinley |
Broken down freight train |
2 hours 30 minutes |
Portsmouth area |
Electrical supply problems |
3 hours 35 minutes |
Southern England |
Slippery rails |
3 hours 28 minutes |
Brookwood |
Landslip |
2 hours 25 minutes |
Aberystwyth |
Trees on the line |
5 hours 10 minutes |
Monday 27th November |
|
|
Mill Hill Broadway |
Over-running engineering works |
3 hours 55 minutes |
Barnes |
Over-running engineering works |
7 hours 51 minutes |
Frimley |
Emergency engineering works |
2 hours 47 minutes |
Swinton |
Signalling problems |
3 hours 3 minutes |
Swindon |
Signalling problems |
2 hours 55 minutes |
London Bridge |
Signalling problems |
3 hours 19 minutes |