Transport Watch UK Focusing on UK's Traffic & Traffic Systems

DELAYS 5 DAYS COMMENCING MONDAY 18th DECEMBER 2006

LOCATION

CAUSE OF DISRUPTION

DURATION

Bridgend

Police in attendance

4 hours and 18 minutes

Hucknall

Over-running engineering works

8 hours 59 minutes

Oakleigh Park

Fatality on the line

In excess of 3 hours

Boston (Lincs)

Signalling problems

3 hours and 5 minutes

Crystal Palace

Signalling problems

4 hours and 16 minutes

Midgham

Fatality on the line

6 hours and 2 minutes

Stratford (London)

Signalling problems

2 hours and 45 minutes

Feltham

Broken down train

4 hours

Billingham (Tees)

Problem near to the line

Several days

Ardlui (Highlands)

Landslips

Several days

Perth/Pitlochry

Flooding

Several days

Kilwinning

Fatality on the line

2 hours and 6 minutes

Smitham

Broken down train

2 hours and 9 minutes

Edenbridge

Broken down train

2 hours

Billingshurst

Slippery tracks

4 hours and 24 minutes

Cheltenham

Bridge strike

2 hours and 27 minutes

Stowmarket

Signalling problems

3 hours and 43 minutes

Finsbury Park

Signalling problems

2 hours and 28 minutes

Thorne South

Obstruction on the line

In excess of 5 hours

Manor Park (London)

Broken down train

2 hours and 12 minutes

Drayton Pk (London)

Problems with overhead wires

8 hours

Aberdare/Pontypridd

Signalling problems

8 hours and 43 minutes

Eden Park

Emergency engineering works

4 hours and 55 minutes

Yarm (Cleveland)

Emergency engineering works

2 hours and 17 minutes

Chadwell Heath

Problems near to the line

In excess of 2 hours

Sandwell and Dudley

Broken down train

In excess of 4 hours

Stratford/Richmond

Electrical supply problems

4 hours and 53 minutes

Shenfield to Southend

Power supply problems

7 hours and 53 minutes

Marston Green

Overhead wire problems

2 hours and 52 minutes

Swansea

Signalling problems

2 hours and 9 minutes

Return to train delays...


© Transport Watch UK 2003

Designed by: 1PCS.co.uk