DELAYS 5 DAYS COMMENCING MONDAY 18th DECEMBER 2006
LOCATION |
CAUSE OF DISRUPTION |
DURATION |
Bridgend |
Police in attendance |
4 hours and 18 minutes |
Hucknall |
Over-running engineering works |
8 hours 59 minutes |
Oakleigh Park |
Fatality on the line |
In excess of 3 hours |
Boston (Lincs) |
Signalling problems |
3 hours and 5 minutes |
Crystal Palace |
Signalling problems |
4 hours and 16 minutes |
Midgham |
Fatality on the line |
6 hours and 2 minutes |
Stratford (London) |
Signalling problems |
2 hours and 45 minutes |
Feltham |
Broken down train |
4 hours |
Billingham (Tees) |
Problem near to the line |
Several days |
Ardlui (Highlands) |
Landslips |
Several days |
Perth/Pitlochry |
Flooding |
Several days |
Kilwinning |
Fatality on the line |
2 hours and 6 minutes |
Smitham |
Broken down train |
2 hours and 9 minutes |
Edenbridge |
Broken down train |
2 hours |
Billingshurst |
Slippery tracks |
4 hours and 24 minutes |
Cheltenham |
Bridge strike |
2 hours and 27 minutes |
Stowmarket |
Signalling problems |
3 hours and 43 minutes |
Finsbury Park |
Signalling problems |
2 hours and 28 minutes |
Thorne South |
Obstruction on the line |
In excess of 5 hours |
Manor Park (London) |
Broken down train |
2 hours and 12 minutes |
Drayton Pk (London) |
Problems with overhead wires |
8 hours |
Aberdare/Pontypridd |
Signalling problems |
8 hours and 43 minutes |
Eden Park |
Emergency engineering works |
4 hours and 55 minutes |
Yarm (Cleveland) |
Emergency engineering works |
2 hours and 17 minutes |
Chadwell Heath |
Problems near to the line |
In excess of 2 hours |
Sandwell and Dudley |
Broken down train |
In excess of 4 hours |
Stratford/Richmond |
Electrical supply problems |
4 hours and 53 minutes |
Shenfield to Southend |
Power supply problems |
7 hours and 53 minutes |
Marston Green |
Overhead wire problems |
2 hours and 52 minutes |
Swansea |
Signalling problems |
2 hours and 9 minutes |
Return to train delays...
|