Transport Watch UK Focusing on UK's Traffic & Traffic Systems

TRAIN DELAYS WEEK COMMENCING 8TH JANUARY 2007

Location Cause Duration
Whittlesford Overhead wire problems 3 hours 58 mins
Oxenholme Lake District Overhead wire problems In excess of 10 hours
Helensburgh/Dumbarton Landslip In excess of 18 hours
Inverness to Perth Flooding In excess of 12 hours
Craigendoran Electrical supply problems 10 hours 34 mins
Taunton – Westbury Bridge strike 3 hours 5 mins
Glasgow QS to Edinburgh Flooding 3 hours 40 mins
Sunderland Overhead wire problems 2 hours
Huddersfield to Penistone Signalling problems 6 hours 10 mins
Rock Ferry (Merseyside) Fire In excess of 16 hours
Llandudno Jct  – Bleanau Ff Flooding Line closed indefinitely
Caersws Flooding In excess of 23 hours
Motherwell Flooding In excess of 4 hours
Rowlands Castle Broken down freight train 5 hours 27 mins
Stevenage to Alexandra Pal Overhead wire problems 2 hours 53 minutes
Redhill Tree on the line 3 hours 19 mins
Paignton Tree on the line 2 hours 35 mins
Walsden Flooding 2 hours 15 mins
Markinch Signalling problems 3 hours 27 mins
Reading to Newbury Signalling problems 2 hours 28 mins
Paddock Wood Tree on the line 3 hours 25 mins
New Barnet Overhead wire problems 2 hours 10 mins
Newington (Kent) Tree on the line 6 hours 6 mins
Westcliff-on-Sea Overhead wire problems 5 hours 16 mins
Brandon (Norfolk) Trees on the line 2 hours 26 mins
Kenley Tree on the line 5 hours 10 mins
Bristol Parkway to Swindon Flooding In excess of 36 hours
Wandsworth Road (London) Signalling problems 2 hours 43 mins
Bow Brickhill Flooding 7 hours 40 mins
Sowerby Bridge Bridge strike 3 hours 10 mins
Stowmarket Problems with lineside equipment In excess of 2 hours
Wandsworth Common Broken down train In excess of 5 hours
Partick (Glasgow) Described as “Obstruction on line” 5 hours 50 mins
Hackney Wick/Stratford Signalling problems 4 hours 51 mins
London Waterloo Emergency engineering work 4 hours 8 mins
St Erth to St Ives No trains available to provide svce Line closed indefinitely
Liskeard to Loose No trains available to provide svce Line closed indefinitely
Taunton Fatality on the line 2 hours 39 mins
Bromsgrove Broken down train 4 hours 42 mins
Dorridge Broken down train 2 hours 31 mins
Edinburgh Signalling problems 7 hours 4 mins
Rochford (Essex) Bridge strike 3 hours 5 mins

Return to train delays...


© Transport Watch UK 2003

Designed by: 1PCS.co.uk